Archives

All posts for the month July, 2016

DELIVERANCE TABERNACLE BAPTIST CHURCH, Chester Township, Pennsylvania – Now called Eternal Hope of Glory, this congregation was established in May of 1980 by Pastor Leroy H. Carter.  It was in July of 1983 that the church had the opportunity to purchase a one-acre parcel of land from Chester Township for a total of $1.00.  This land was to be the location of their new church home.  In 1985 the leadership of the church contacted Dimensional Dynamics to start the process of planning and design of that new home.  We were honored to be there guiding the church through the entire process until the facility’s final completion in 1989.  Please enjoy taking a look at this project constructed in 1989.

CURRENT VIEW OF FACILITY

CURRENT VIEW OF FACILITY

 

MASTER PLAN SITE PLAN

MASTER PLAN SITE PLAN

PHASE ONE SITE PLAN

PHASE ONE SITE PLAN

PHASE ONE FACILITY

PHASE ONE FACILITY

CHURCH SITE

CHURCH SITE

GROUND BREAKING - 1987

GROUND BREAKING – 1987

GROUND BREAKING - 1987

GROUND BREAKING – 1987

GROUND BREAKING - 1987

GROUND BREAKING – 1987

GROUND BREAKING - 1987

GROUND BREAKING – 1987

CONSTRUCTION PHASE

CONSTRUCTION PHASE

CONSTRUCTION PHASE

CONSTRUCTION PHASE

FINISHED FACILITY - 1989

FINISHED FACILITY – 1989

WORSHIP CENTER

WORSHIP CENTER

TRINITY UNITED CHURCH, Wallaceburg-Ontario, Canada – in 1978, Trinity United Church suffered a devastating fire which totally destroyed their facility. Dimensional Dynamics aided this church with choosing a site for their new facility within the City limits which afforded them the use of many public and private parking facilities within a two-block radius. Dimensional Dynamics then worked with Trinity United in writing of a program of space needs and in laying out a design that would offer them weekly on-site parking and a flexible functional facility that would meet the ministry needs but also address the church’s desire for low energy consumption.  This energy reduction was primarily accomplished with higher R-factors in the walls ans ceilings and zoned heating based on the programs use; insulated window shutters; double glazing of the exterior windows and entrance vestibules.  Finally, when architectural services were need in the preparation of construction documents, Dimensional Dynamics worked to associate as the designer with a local architect, James H. Jordan, located in Chatham, Ontario.  When completed, the church stated in a letter to our Founder, L. Gordon Bucy: “Thanks to your help, and God’s blessing, we have a church building in which we have great pride and still have money left over in the bank!  We could not have expected such good fortune in the normal course of events.”  Please enjoy taking a look at this project constructed in 1980.

http://www.youtube.com/watch?v=l_nnRADkU6w

RENDERING OF PROPOSED FACILITY

RENDERING OF PROPOSED FACILITY

SITE&FLOOR_PLAN

PROPOSED SITE AND FLOOR PLAN

PROPOSED FLOOR PLAN

PROPOSED FLOOR PLAN

WINDOW - Article 1979

WINDOW – Article 1979, Page 1

WINDOW - Article, Page 2

WINDOW – Article, Page 2

WINDOW - Article, Page 3

WINDOW – Article, Page 3

SANCTUARY

SANCTUARY

VIEW TOWARDS CHANCEL

VIEW TOWARDS CHANCEL

CHANCEL

CHANCEL

CHOIR

CHOIR

ENTRANCE NARTHEX AND OVERFLOW

ENTRANCE NARTHEX AND OVERFLOW

KITCHEN

KITCHEN

ENTRANCE DROP-OFF

ENTRANCE DROP-OFF

STEEPLE

STEEPLE